Yes, even if the fixtures will be purchased later. Planning the intended lighting, power and controls before finished paving helps coordinate the construction. It also gives you time to decide what should be visible after dark and what should remain quiet.

What should the lighting actually help you do?
Start with the route from the house, changes in level and the places where people sit or cook. Then decide which planting or architectural features deserve emphasis. A plan based only on the number of fixtures can miss the way the garden is used. Describe the desired evening experience before choosing a catalogue of fittings.
What information should the designer and electrician share?
Use one coordinated layout showing paving, steps, structures, planting and proposed equipment locations. Ask the relevant electrical contractor to determine the installation requirements and supply arrangements. ESA’s outdoor-safety guidance addresses outdoor outlets, equipment and powerline hazards. Electrical Safety Authority: outdoor safety. Do not treat a decorative lighting sketch as electrical installation instructions.
Can you leave provision for lighting in a later phase?
Discuss a documented future phase before paving begins. Ask which routes and access provisions should be installed now, who designs them and how their positions will be recorded. “We can add it later” is less useful than an agreed allowance. Avoid placing future fixtures where new planting, gates or furniture will immediately obstruct them.

How do you avoid an overlit backyard?
Ask for a proposal that distinguishes everyday use from entertaining. Consider views from inside the house and from neighbouring windows. A trial or evening adjustment can help assess the effect of selected fixtures. Discuss aiming and controls rather than assuming more brightness produces a better result. The lighting should support the landscape’s composition and the way you use it.
What should you receive at handover?
Request product information, control instructions and a record of the installed arrangement. Ask how to obtain replacement components and whom to contact for service. Keep irrigation and lighting records together so future garden work can be planned with the installed systems in mind. Separate product warranties, installation scope and any ongoing service agreement instead of treating them as one blanket promise.
Quick answers
Is permanent holiday lighting the same as landscape lighting?
No. They serve different visual purposes. Plan facade or roofline lighting together with garden lighting, but define each scope separately.
Can lighting be added to an existing patio?
Often there are options, but the route and restoration requirements need assessment. Planning before construction gives more coordination opportunities.
Discuss your project.
Bring your property location, photographs and priorities to the first conversation. Explore Landscape Lighting, Permanent LED Lighting, Sprinkler & Irrigation Systems, Interlocking Patios to define the work you want.
Sources and further reading
Official guidance checked September 12, 2026. Confirm current requirements for your property and selected products.